It is important to cooperate already in the design phase
2
The shaft must de planned to fit the Lift's size
3
Under the construction of the shaft is important to keep the correct size, the vertical and horizontal surfaces, otherwise the lift will not fit.
4
The lift presses only the floor. The material of the walls is optional
5
When both the pit and the lift are completed, the transport and installation takes 1-2 days only
6
During the installation the area of the pit should be kept free. The scissor part of the lift is over 3tons. It needs a hevy crane to lift it. Usually the delivery truck is equipped with such a crane.
7
When the scissor part is already in the shaft the lift is eletrcic and hydraulic connected and the functions are controlled
8
Now can be the extensions installed. After this the columns and the roof
9
After the lift is ready the main control box and the upper and lover control units will de installed
10
At last the lift will be tried with a car as well. The lift is ready to handover after every shipping damage is corrected.
11
Now the roof can be paved or grass can be layed