The installation starts already on the design table. It is necessary for the customer and our company to cooperate to choose the best suitable option.
2
it is important to inform us about every modification during the construction
3
The installation begins with the delivery. It must be well organized because problems with the parking or loanding out can cause more days delay
4
At first the columns are raised then the frame. When itis ready the hydraulic an eletric system will be connected and the lift can be functionally tested
5
The lift will be now fixed to the floor and wall. The platform plates and the controls boxes can be mountednow
6
After everything is ready the lift can be tried with cars as well
7
If it is necessary we produce and install teh fences as well
8
At the handover the users will be taught to opreate the lift correctly and accident free